Talk to our team

+255 715 558 060 info@interkasiengineering.co.tz

P. O. Box 10964, Arusha, Tanzania

Company Profile
Construction of Kundy Polyclinic Hospital — hospital project in Tanzania

HomeProjectsKundy Polyclinic Hospital

Project 04HospitalOngoing

Kundy Polyclinic Hospital

Electrical, solar backup, ICT, security and building systems for a polyclinic hospital in Dar es Salaam.

Client
Kundy Hospital
Location
Tabata, Chang’ombe, Dar es Salaam, Tanzania
Category
Hospital
Status
Ongoing

Overview

The Kundy Polyclinic Hospital project in Tabata, Chang’ombe, Dar es Salaam, is listed as ongoing. Its documented scope combines hospital electrical installation with ICT, CCTV, fire alarm, air conditioning, solar backup power, time attendance and access control.

Healthcare buildings rely on coordinated electrical and building systems. The project scope includes essential electrical works as well as security, communications, climate control and solar backup power systems.

Project focus

The scope is designed around multiple operational systems within a healthcare facility, with power, access management and safety-related infrastructure addressed together.

Scope of works

What the project covers

8 packages delivered by one team.

  1. 01

    Hospital electrical installation

  2. 02

    ICT

  3. 03

    CCTV

  4. 04

    Fire alarm

  5. 05

    Air conditioning

  6. 06

    Solar backup power systems installation

  7. 07

    Time attendance system

  8. 08

    Access control

Have a similar project in mind?

Talk to Interkasi about electrical installations, solar power, transformer works and integrated building systems.

Call us Company Profile